Green energy fabrication

Pilot plant vessels, tanks and skids for low-carbon technology. We help New Zealand companies build new process prototype plant, then build it again at scale.

Helping build New Zealand’s energy future

New energy technology usually means starting with pilot plant scale. Our consultancy and design team collaborates on buildability, then we make it possible to build and test small-scale before full fabrication.

For a low-carbon material start-up’s pilot plant, we built a set of stainless vessels, preheaters and reactors that were fundamental to them achieving funding for commercial scale.

What we build for green energy

Pilot plants

Pilot-scale vessels that prove a process before you commit to full scale.

Reactors & process vessels

316 and 316L reactors and process vessels, TIG welded and inspected against your drawings.

Skids & frames

Skid mounts, support frames and platforms that hold process equipment together.

Design for manufacture

Detailing that brings the unit cost down as you scale up.

Feasibility & costing

Early design reviews and cost planning, so the budget is clear before material is ordered.

Install & maintain

Installation by our crew, and maintenance guidance once you’re running.

Why green energy teams build with us

____

First-of-a-kind builds

Engineers who enjoy collaborating on a problem nobody has solved yet.

____

Scale-ready design

Design for Manufacture builds in efficiency as you scale.

____

Intellectual property respected

Your intellectual property sits with you.

____

Fast prototyping

Our Profile Centre cuts parts on site, so prototype changes turn around fast.

Our services

Project Consultancy

We analyse your vision, develop a project roadmap and engineer the best outcome.

Design

Our design team adapts your idea into detailed plans that become engineered solutions.

Cut. Form. Build.

Precision manufacturing, assembly, installation and project management.

Who We Work With

We partner with industry leaders setting the benchmark, and innovators looking to shape something remarkable.

Fonterra
Beca
Fletcher Construction
GEA Engineering
Brian Perry Civil
Hamilton City Council
Tauranga City Council
Watercare
Tetra Pak

Green Energy FAQs

Yes. We refine the concept with you, model it in 3D and build a metal prototype you can test.

Your intellectual property remain yours. We sign NDAs and agree on ownership of any new IP in writing before work starts.

Yes. We apply Design for Manufacture early, which keeps cost per unit down as volumes grow.

Dedicated to building the future

Need a team of problem-solving fabricators?